News
News
imgLocation:
Home
>
>
>
Self-monitoring and implementation report for the second quarter of 2020

Self-monitoring and implementation report for the second quarter of 2020

  • Author:
  • Origin:
  • Time of issue:2020-08-25 10:13
  • Views:

(Summary description)In accordance with the requirements of the “Measures for the Self-Monitoring and Information Disclosure of National Key Monitoring Enterprises (Trial)”, the self-monitoring situation of Zhejiang Pinghu Hualong Industrial Co., Ltd. in the second quarter of 2020 is now announced.

Self-monitoring and implementation report for the second quarter of 2020

(Summary description)In accordance with the requirements of the “Measures for the Self-Monitoring and Information Disclosure of National Key Monitoring Enterprises (Trial)”, the self-monitoring situation of Zhejiang Pinghu Hualong Industrial Co., Ltd. in the second quarter of 2020 is now announced.

  • Categories:Company News
  • Author:
  • Origin:
  • Time of issue:2020-08-25 10:13
  • Views:0
Information

Zhejiang Pinghu Hualong Industrial Co., Ltd.

Self-monitoring and implementation report for the second quarter of 2020

August 2020

(Stamp)

In accordance with the requirements of the “Measures for the Self-Monitoring and Information Disclosure of National Key Monitoring Enterprises (Trial)”, the self-monitoring situation of Zhejiang Pinghu Hualong Industrial Co., Ltd. in the second quarter of 2020 is now announced.

1. The implementation of the company's self-monitoring plan

Monitor the adjustment and change of the plan.

Zhejiang Pinghu Hualong Industrial Co., Ltd. formulated the "Zhejiang Pinghu Hualong Industrial Co., Ltd. Enterprise Self-Monitoring Program" in January 2020, and carried out enterprise self-monitoring work in strict accordance with the requirements of the enterprise self-monitoring program, and logged in the "Zhejiang Pollution Source Monitoring" in a timely manner "Data Management System" fill in the relevant information of the enterprise, and the annual self-monitoring plan is strictly implemented in accordance with the requirements of the pollution discharge permit.

2. Self-monitoring situation in the second quarter

In the second quarter, 100% of the wastewater was monitored online, and the surrounding environmental quality impact monitoring results were carried out as required.

Starting from the second quarter of 2020, self-service online sewage monitoring will be carried out. The self-monitoring work is carried out in an automatic way. Automatic monitoring means that the data is the hourly average data of CEMS, in which the equipment operation rate is 100%, and the data transmission rate is 100%. The third-party unit of operation and maintenance is Zhejiang Chuangyuan Technology Co., Ltd.

The emission monitoring point for lead and its compounds is at the entrance of a 9.5-meter chimney. The main monitoring indicators are lead dust, lead smoke, sulfuric acid mist, and non-methane total hydrocarbons. To

(1) Particulate matter (lead smoke, lead dust) is monitored 3 times (once a month), 3 times of compliance with the standard, no exceeding the standard, the average emission concentration of lead smoke is 0.0683mg/m3, and lead dust is 0.080mg/m3, which conforms to "Emission Standard of Pollutants for the Battery Industry" (GB30484-2013≤0.5 mg/m3); the average emission concentration of sulfuric acid mist (once every season) 0.7 mg/m3 meets the "Emission Standard for Pollutants for the Battery Industry" (GB30484-2013≤5 mg/ m3); The average emission concentration of organic waste gas (once every season) is 78.3mg/m3 in line with the "Comprehensive Emission Standard of Air Pollutants" (GB16297-1996≤120mg/m3);

(2) Sewage uses 100% online monitoring for lead, PH value, and flow rate. Online monitoring data is connected to the Environmental Protection Agency. In the second quarter, the monitoring of lead, PH value and flow rate indicators all comply with GB30484-2013. Lead content ≤0.5 mg/m3) None Excess conditions;

(3) The COD and ammonia nitrogen indicators of the water processed by the sewage treatment station are monitored daily and the qualified third-party Zhejiang Hebang Safety Technology Company is entrusted to conduct the testing. The COD and ammonia nitrogen indicator test results meet the requirements of the GB30484-2013 standard;

(4) The noise at the boundary of the plant is manually monitored. The number of monitoring is 1 time and the number of compliance is 1 time. There is no over-standard situation. The average noise of the plant boundary during the day: 57.9dB(A). Comply with "Environmental Noise Emission Standards for Industrial Enterprises" (GB, 12348-2008) Category 3 standard, daytime ≤65 dB(A).

(5) In accordance with relevant requirements, our company commissioned a qualified third party to monitor the surrounding environmental quality and groundwater in July 2020. The monitoring will be conducted once a year. The points of surface water, groundwater, and soil are 7 points, At 4 points, the pollutant concentration meets the standard, and there is no over-standard situation. To

3. Situation of polluted facilities and equipment

According to the equipment maintenance plan in the second quarter, the equipment department regularly maintains polluted equipment and facilities to ensure the effective operation of the facilities;

Zhejiang Pinghu Hualong Industrial Co., Ltd.

July 20, 2020

Scan the QR code to read on your phone

Related News

Zhejiang Pinghu Hualong Industrial Co., Ltd.

Tel: +86-573-85746666
Fax: +86-573-85746666
E-mail: 
zjhualong@vip.163.com

Add: No. 558, Jinsha Road, Xincang Industrial Zone, Pinghu, Zhejiang

Follow Us

Zhejiang Pinghu Hualong Industrial Co., Ltd.

View Mobile

© 2021 Zhejiang Pinghu Hualong Industrial Co., Ltd. All Rights Reserved.    浙ICP备11002410号-1

Powered by: www.300.cn

© 2021 Zhejiang Pinghu Hualong Industrial Co., Ltd. All Rights Reserved.    

浙ICP备11002410号-1     

Powered by: www.300.cn